500kV class · Tempe, Arizona · Salt River Project (SRP)
Kyrene carries all three levels, 500kV down to 230 and 69, on one site in the middle of the Phoenix metro. The Palo Verde 500kV line lands here, so it is a genuine bulk-power hub rather than a neighborhood station.
Tight quarters, an industrial plant right at the fence line, and load that never really lets up.
Tell us the voltage class, the site, and the timeline. ESS mobilizes across the West.
Contact Us →