345kV class · Page, Arizona · Western Area Power Administration
The switchyard at the top of Glen Canyon Dam takes hydro generation off the Colorado River and puts it onto 345kV lines toward Phoenix, with a 230kV tie east into New Mexico. Long strings of insulators, lattice dead-ends, and disconnect stacks, all sitting in the red-rock canyon at Page.
Work in that setting is as much about access, footing, and the heat as it is about the steel.
Tell us the voltage class, the site, and the timeline. ESS mobilizes across the West.
Contact Us →